Today, after a 13 hour day at work (and I left a note for the contractor telling him it was a 12 hour day, go crazy...) - the tile in the bathroom has been grouted. A protective plastic sheet over the floor.

There's other changes as well, I try to spot them, I can see them but not quite....

The toilet's been cleaned. And the bathmat is folded different across the side of the tub. Perhaps the drywall has been trimmed, cut more evenly, perhaps the plaster sanded a little better, but I'm not sure, this is just speculation. I take pictures.

There's a note telling me he's out of town Saturday, he'll "finish up" on Sunday (walls painted, shelves installed, electrics? Not bloody likely I'm thinking...), we'll talk before then (when? This Sunday?...).  Day 8 diary of a contractor, Day 9 is out of town... 